160T Concrete Metro Bridge Construction Beam Launcher Girder Crane
Product Description
160T Concrete Metro Bridge Construction Beam Launcher Girder Crane is a device that puts the prefabricated beam on the prefabricated pier. The bridge crane belongs to the crane category, because its main function is to lift the beam piece, and then transport it to the position and then lower it. But it is very different from cranes in general. The requirements are harsh, and there is walking on the beam, or it is called vertical displacement.
Installation Site
Disassembly and maintenance
1. When disassembling the girder beam, support it with a sleeper
stack. The sleeper stack must be firm and reliable. High-strength
bolts dismantled after being heated by flames must be scrapped and
not allowed to be inherited.
2. Workers entering the demolition site must wear safety helmets
and protective shoes. Staff who do homework above the girder beam
must wear safety belts. This is the most basic safety protection
for operating bridge installation equipment.
3. The electrician should mark all cables and wires before
dismantling, and the dismantling site should be blocked, and
irrelevant employees are strictly prohibited from entering.
4. In case of temporarily dismantled bolts, dismantle after
applying diesel infiltration. Do not dismantle by forcing a blow or
heating with flame.
5. After the bridge frame beam is completed, the track should be
laid, the bridge crane should be driven to the bridge head, and the
disassembly work should be performed. The crew should identify the
hydraulic fittings, oil cylinders and other components that need to
be marked to facilitate disassembly and next assembly.
6. The dismantling work is organized and directed by the person in
charge of the bridge and the technical staff, and it is performed
in the reverse order of assembly.
7. The removed parts should be maintained and classified, and the
interface of the hydraulic pipe fittings should be sealed.