Sign In | Join Free | My himfr.com
Home > Launcher Crane >

Launcher Mobile Girder Crane Construction Beam High Efficiency ISO CE Certification

Henan Dowell Crane Co., Ltd.
Contact Now
    Buy cheap Launcher Mobile Girder Crane Construction Beam High Efficiency ISO CE Certification from wholesalers
     
    Buy cheap Launcher Mobile Girder Crane Construction Beam High Efficiency ISO CE Certification from wholesalers
    • Buy cheap Launcher Mobile Girder Crane Construction Beam High Efficiency ISO CE Certification from wholesalers

    Launcher Mobile Girder Crane Construction Beam High Efficiency ISO CE Certification

    Ask Lasest Price
    Brand Name : Dowellcrane
    Model Number : JQJ Beam Launcher Girder Crane
    Certification : ce iso
    Price :
    Payment Terms : L/C, T/T
    Supply Ability : 5000 Sets per Year
    Delivery Time : 60days
    • Product Details
    • Company Profile

    Launcher Mobile Girder Crane Construction Beam High Efficiency ISO CE Certification

    160T Concrete Metro Bridge Construction Beam Launcher Girder Crane


    Product Description


    160T Concrete Metro Bridge Construction Beam Launcher Girder Crane is a device that puts the prefabricated beam on the prefabricated pier. The bridge crane belongs to the crane category, because its main function is to lift the beam piece, and then transport it to the position and then lower it. But it is very different from cranes in general. The requirements are harsh, and there is walking on the beam, or it is called vertical displacement.


    Installation Site



    Disassembly and maintenance


    1. When disassembling the girder beam, support it with a sleeper stack. The sleeper stack must be firm and reliable. High-strength bolts dismantled after being heated by flames must be scrapped and not allowed to be inherited.
    2. Workers entering the demolition site must wear safety helmets and protective shoes. Staff who do homework above the girder beam must wear safety belts. This is the most basic safety protection for operating bridge installation equipment.
    3. The electrician should mark all cables and wires before dismantling, and the dismantling site should be blocked, and irrelevant employees are strictly prohibited from entering.
    4. In case of temporarily dismantled bolts, dismantle after applying diesel infiltration. Do not dismantle by forcing a blow or heating with flame.
    5. After the bridge frame beam is completed, the track should be laid, the bridge crane should be driven to the bridge head, and the disassembly work should be performed. The crew should identify the hydraulic fittings, oil cylinders and other components that need to be marked to facilitate disassembly and next assembly.
    6. The dismantling work is organized and directed by the person in charge of the bridge and the technical staff, and it is performed in the reverse order of assembly.
    7. The removed parts should be maintained and classified, and the interface of the hydraulic pipe fittings should be sealed.


    Parts Of Crane



    Quality Launcher Mobile Girder Crane Construction Beam High Efficiency ISO CE Certification for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Henan Dowell Crane Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)